shell@jsjms.com

News

Complex purification and simple breathing

Current location: News > Company News
Ventilation System Questions and Answers Issue129
Release time:2025-07-02 08:52:30| Views:

According to Bahrain's climate characteristics and building requirements, the following places are suitable for installing ERV (Energy Recovery Ventilation) systems

taking into account energy saving and humidity control:


1. Commercial and public buildings

Shopping centers/office buildings: large flow of people, continuous ventilation is required and sensitive to temperature and humidity. ERV can reduce air conditioning energy consumption when exchanging air, 

especially suitable for maintaining indoor humidity balance in Bahrain's dry climate.


Airports and transportation hubs: such as Bahrain International Airport (Manama), the space is closed and the air quality requirements are high. ERV can effectively filter external dust and recover energy.


2. Industrial and energy facilities

New green energy projects: such as the rooftop photovoltaic project of Salman Port in Bahrain, as the first energy-self-sufficient port in the Gulf, the supporting ERV system can optimize the internal ventilation of 

the plant and reduce the cooling load.


Industrial plants: workshops that require large space ventilation (such as the places mentioned in the ventilator installation guide), ERV combined with exhaust system can control dust and reduce energy consumption.


3. ‌Residential and community space‌

High-end residential areas and apartments‌: ERV is suitable for modern buildings with high airtightness, balancing humidity during high summer temperatures and avoiding excessive dryness

 (Bahrain has a tropical desert climate).

Government affordable housing projects‌: In line with Bahrain's household photovoltaic plan (such as the 1,000-household installation target), ERV can improve energy efficiency and reduce electricity costs.


4. ‌Installation considerations‌

Space and regulations‌: Equipment installation and pipeline space must be reserved, and local building safety regulations (such as fire zoning, power configuration) must be met.

Humidity adaptability‌: The core of ERV's superiority over HRV is humidity control ability. It can reduce humidification needs in arid areas of Bahrain, but filters need to be

 regularly maintained to prevent dust clogging.

Cost trade-off‌: The initial investment is high, but the long-term energy-saving effect is significant, especially suitable for commercial places with high electricity costs.


Summary and suggestions


Give priority to densely populated or energy-sensitive places: New commercial complexes, green energy bases, and high-end residential buildings are the best scenarios;

 industrial areas need to evaluate dust loads; ordinary residential buildings can also be installed if they are well sealed and have sufficient budget. Before installation, 

the air volume needs to be designed based on local climate data, and equipment models that are resistant to high temperature and dust should be selected.

HRV Ventilation System ERV Fresh Air System



 
 
 Previous article:Ventilation System Questions and Answers Issue128 Next article:Ventilation System Questions and Answers Issue130

Recommend News

About Us

Company Profile

18705226241

E-mailshell@jsjms.com

Tel:+8618705226241

WeChat18705226241

Factory address:Yundan Road No.7,Bayiji Town PizhouCity  Xuzhou City  Jiangsu Province

Our location
Tel
QQ
Top

Follow us

Copyright © 2025    Jiangsu Gmusem Ventilation System Manufacture Co., Ltd.

+86 18705226241
X

Screenshot, WeChat recognition QR code

WeChat:+86 18652267779

(WeChat account has been copied, go and add friends now)

WeChat account has been copied. Please open WeChat to add consultation details!
X

WhatsApp

+86 18705226241